Get a detailed commercial proposal within 24hoursSauriesi, Stopini parish, Ropazi municipality, "Lejas Akmenkalni", LV-2118info@urb.lv+371 28 150 254WhatsApp

Pricing & Budget Planning

Investment-Worthy Water Systemswith Predictable Costs

Every proposal comes with a detailed estimate—equipment mobilization, indoor fittings, and handover support are documented before work begins.

Need financing or phased billing? We lock the price for 60 days while paperwork is processed.

Baseline drilling program€2300
Average completion time17 days
Savings vs. water delivery11%

Estimation Tool

Model your project in secondsChange the depth, scope, and region to get a live estimate including logistics, documentation, and handover.

Select add-ons

Add casing reinforcement, flushing, filter setup, or prep work.

Region

Covers crew travel, ferries, and lodging.

Projected Investment

2300 €

Works for 30m in the Riga & Pieriga region, ready for permit approval.

No add-ons selected
  • Base package: 2300 €
  • Depth premium: 0 €
  • Add-ons: 0 €
  • Regional logistics: 0 €

Need Reassurance?

Doubting if water can be sourced on your property?We can help! Let's start with a thorough site survey.

Choose the most convenient way to reach our team.

Client Testimonials

Owners who rely on Urb every weekTen fresh notes from homeowners, resorts, and developers who entrust us with their water.

The crew finished the well and room assemblies without damaging our mature garden.

Daina & MartinsGarkalne property
Drilling

Telemetry warned us before the freeze, and the team winterized the system in a single visit.

Janis V.Cesis property
Maintenance

The technical room looks like a design project—powder-coated manifolds and perfect lighting.

Ilze PetrovicaJurmala guesthouse
Installation

Urb handled the permits, lab work, and documents so investors could give the green light.

Roberts P.Adazi facility
Compliance

Routed around granite without delays and left daily progress notes.

Liga & AndrisSigulda slope
Field Team

24/7 monitoring saved us during a holiday weekend when pressure dropped—resolved remotely.

Hotel A13Vidzeme coast
Monitoring

Prices remained locked even after filter additions mid-project.

Edgars K.Agenskalns house
Pricing

Documents arrived with QR codes, torque data, and lab certificates—impressive discipline.

SarmiteRoja municipality
QA

The assembly team protected the hardwood floors, labeled every valve, and handed over a photo album.

Laura A.Ogre retreat
Finishing

We now feed thirty cabins with an Urb system and see real-time consumption by block.

Baltic CabinsLatgale resort
Scaling