Get a detailed commercial proposal within 24hoursSauriesi, Stopini parish, Ropazi municipality, "Lejas Akmenkalni", LV-2118info@urb.lv+371 28 150 254WhatsApp

Precision Drilling

Engineered WellsFor Modern Private Water Supply

From pine forests to rocky sands—we handle permits, logistics, and handovers while you watch the progress on a shared dashboard.

We unite topographers, drilling rigs, and monitoring into one team so every well is completed faster, cleaner, and ready for automation.

Deepest site310 m
On-site preparation<24h
Properties serviced200+
Warranty2 years

What We Take Over

Layers of precision in every well

Hydrogeology, clean machinery, and responsive service combine to ensure a peaceful water supply for decades.

Passion for Exploration

We map aquifers, utilities, and neighbors before machinery touches the ground.

  • Parcel survey with depth prediction
  • Utility and easement overlays
  • Seasonal volume modeling

Premium Hardware

Food-grade plastic casings, European pumps, and stainless manifold lines withstand Baltic winters.

  • Dual-rotary rig for mixed geology
  • Certified polyethylene casings
  • Filtration and telemetry

Compliance Shield

We process permits, lab samples, and well logs so authorities approve without delay.

  • Full legal dossier
  • Water quality analyses
  • As-built documentation

Aftercare Included

Remote monitoring, maintenance reminders, and an on-call engineer 24/7.

  • Telemetry alerts
  • Seasonal flush programs
  • Warranty coordinator

Transparent Pricing

Two Clear Financing ModelsQuotes include logistics, permits, and final hardware. No unexpected invoices.

Base Program

€2300

Ideal up to 30 meters with standard sand or clay layers.

  • Up to 30 m rotary drilling
  • Food-grade casing + sealing
  • Pump selection and installation
  • Telemetry-ready wiring

Includes mobilization, first flush, and paperwork.

Beyond 30 m

€70 / m

Predictable pricing for deeper aquifers or complex geology.

  • Dual-rotary machinery
  • Extra casings and sealants
  • Extended pump tests
  • Lab and logistics overhead

Billing applies only to approved additional meters.

Frequent Questions

Everything About Your Well

How to prepare the site?

Ensure a 3 m wide access path for machinery and a power connection. We lay down protective mats if needed.

What is the timeline?

Surveys and permits take 3 –5 days, drilling takes about a week, and handover takes another 2 –3 days depending on the terrain.

Do you prepare the paperwork?

Yes, we submit permits, analyses, and the well log so the municipality doesn't cause delays.

Do you drill in winter?

Absolutely. Heated machinery, anti-icing mats, and insulated manifolds keep us on schedule even in freezing temperatures.

Need Reassurance?

Doubting if water can be sourced on your property?We can help! Let's start with a thorough site survey.

Choose the most convenient way to reach our team.

Client Testimonials

Owners who rely on Urb every weekTen fresh notes from homeowners, resorts, and developers who entrust us with their water.

The crew finished the well and room assemblies without damaging our mature garden.

Daina & MartinsGarkalne property
Drilling

Telemetry warned us before the freeze, and the team winterized the system in a single visit.

Janis V.Cesis property
Maintenance

The technical room looks like a design project—powder-coated manifolds and perfect lighting.

Ilze PetrovicaJurmala guesthouse
Installation

Urb handled the permits, lab work, and documents so investors could give the green light.

Roberts P.Adazi facility
Compliance

Routed around granite without delays and left daily progress notes.

Liga & AndrisSigulda slope
Field Team

24/7 monitoring saved us during a holiday weekend when pressure dropped—resolved remotely.

Hotel A13Vidzeme coast
Monitoring

Prices remained locked even after filter additions mid-project.

Edgars K.Agenskalns house
Pricing

Documents arrived with QR codes, torque data, and lab certificates—impressive discipline.

SarmiteRoja municipality
QA

The assembly team protected the hardwood floors, labeled every valve, and handed over a photo album.

Laura A.Ogre retreat
Finishing

We now feed thirty cabins with an Urb system and see real-time consumption by block.

Baltic CabinsLatgale resort
Scaling